Kitchen Remodel Permits in King County: Kirkland, Bellevue and Redmond
A kitchen remodel generally needs permits when it changes walls, plumbing, electrical wiring, gas piping or mechanical systems. Replacing cabinets, countertops, paint, tile or flooring without altering those systems may be exempt from a building permit. The exact permit path depends on the project address and scope. Kirkland, Bellevue and Redmond each administer permits inside their city limits, while King County Permitting serves unincorporated areas.
Permit requirements are based on the work being performed, not the price or name of the project. A remodel advertised as a cosmetic update can still require an electrical permit if it adds outlets. A cabinet replacement can trigger plumbing review if the sink moves. Removing a wall can require building plans even when the kitchen remains the same size.
This guide explains the general permit process for residential kitchen remodels in Kirkland, Bellevue and Redmond using current city and county guidance. Requirements and fees can change. The applicable jurisdiction makes the final decision for a specific property and scope.
Kitchen Remodel Permit Requirements at a Glance
Finish-only work is the least likely to require a building permit. Structural, plumbing, electrical and gas work normally require the appropriate permits and inspections.
| Kitchen remodel work | Building permit | Trade permit or review | Important limitation |
|---|---|---|---|
| Replacing cabinets in the same layout | Often not required | May be required if wiring or plumbing changes | Cabinet replacement cannot conceal uninspected trade work |
| Replacing countertops | Often not required | Plumbing may apply when disconnecting, relocating or altering fixtures | New support or structural changes can alter the answer |
| Painting, tile or finish flooring | Often not required | Electrical, plumbing or mechanical permits may still apply to related work | Exempt work must still comply with applicable codes |
| Replacing an appliance in the same location | May be exempt when truly like-for-like | Depends on circuit, gas line, venting and plumbing changes | Confirm the city’s definition of like-for-like work |
| Moving a kitchen sink or dishwasher | Usually part of a permitted remodel when walls or layout change | Plumbing permit normally required | Drain, vent and water lines must remain accessible for inspection |
| Adding outlets, lighting or circuits | Building permit depends on the larger scope | Electrical permit normally required | Electrical work must be inspected before it is covered |
| Installing or modifying gas piping | Building permit depends on the larger scope | Mechanical or gas piping permit required | Pressure testing and inspection may be required |
| Installing a new ducted range hood | Building permit depends on the larger scope | Mechanical review or permit may apply | Duct route and makeup-air requirements affect the design |
| Removing or relocating a nonbearing wall | Required or handled through a remodel permit | Electrical or plumbing permits may also apply | Kirkland lists addition, removal or relocation of any wall as permit work |
| Removing a load-bearing wall | Building permit with plan review required | Structural engineering is commonly required | Work cannot begin until the approved load path is established |
| Enlarging a door or window opening | Building permit with plan review required | Structural documents may be required | New headers and lateral requirements may affect the design |
This table is a planning guide, not a permit determination. A wall that appears nonbearing can still contain plumbing, wiring, ductwork or structural bracing. Confirm the full scope before demolition.
When Does a Kitchen Remodel Need a Permit?
A kitchen remodel needs a permit when it alters the building or changes regulated structural, electrical, plumbing, mechanical or gas systems. One project may need several permit disciplines.
Common permit-triggering work includes:
- Adding, removing or relocating interior walls
- Replacing a load-bearing wall with a beam
- Enlarging a doorway, window or exterior opening
- Moving the sink, dishwasher, refrigerator water line or other plumbing
- Adding or relocating receptacles, switches, lighting or appliance circuits
- Upgrading an electrical service or panel
- Installing or altering gas piping for a range or cooktop
- Changing a range hood duct or other mechanical ventilation
- Repairing framing or subfloor damage that affects structural components
- Converting adjacent space into part of the kitchen
The word permit can refer to several approvals. A building permit covers the building and structural scope. Electrical, plumbing and mechanical permits cover the corresponding trades. Some jurisdictions combine trade work under a residential remodel permit. Others require separate applications. The approved permit record shows which inspections are required.
Permit decisions should be made while the layout is being developed. Waiting until cabinets and appliances are ordered can create expensive conflicts if the city requires a different structural detail, electrical layout or ventilation approach.
What Kitchen Work May Not Need a Building Permit?
Cosmetic work that does not affect walls, regulated systems or structural elements may be exempt from a building permit. Cabinet, countertop, paint, tile and floor-finish replacement are common examples, but the exemption does not cover associated electrical, plumbing or gas work.
Kirkland’s current permit guidance lists painting, papering, tiling, carpeting, cabinets, countertops and similar finish work among common projects that do not require a permit. It also lists like-for-like appliance and fixture replacement in the same location when no gas, plumbing or electrical circuits are modified.
Bellevue states that replacing kitchen cabinets and countertops does not require a building permit. The city warns that plumbing or electrical permits may still be required when those trades are involved.
Redmond’s current work-exempt handout includes painting, papering, tiling, carpeting, cabinets, countertops and similar finish work. The exemption applies to the building permit. It does not authorize electrical, plumbing or mechanical work that requires a separate permit.
Three limits matter:
- Exempt does not mean unregulated. Work must still comply with applicable construction, safety and product requirements.
- One exempt task does not exempt the entire project. New cabinets may be exempt while new circuits and relocated plumbing still require permits.
- The actual scope controls. Opening a wall, repairing damaged framing or changing accessibility features can move the work outside a finish-only exemption.
When the scope sits between cosmetic replacement and a remodel, send the jurisdiction a written description before work begins. Include whether walls, circuits, fixtures, gas piping or ventilation will change. A clear answer from the permit center is more reliable than a contractor’s assumption.
How Do Structural Wall Changes Affect the Permit?
Removing or altering a load-bearing wall requires a building permit and plan review. Nonbearing wall work may follow a simpler remodel path, but it is not automatically permit-free.
A load-bearing wall transfers weight from the roof, floor or another part of the building to the foundation. Removing it without a designed replacement can cause sagging, cracking or structural failure. An approved design commonly includes a beam, posts, connections and adequate support below each post.
The load path does not stop at the new beam. A concentrated post load may require work in the floor system, crawl space, basement or foundation. This is why sizing a beam from an online chart is not a complete structural plan.
Kirkland specifically lists the addition, removal or relocation of walls, whether load-bearing or not, as work that requires a permit. Bellevue separates its remodel paths. Nonbearing wall work can qualify for a single-family remodel permit without plan review, while moving a load-bearing wall or replacing one with a beam uses the city’s remodel permit with plan review.
Redmond routes residential alterations and remodels for review based on their scope. Its residential permit guidance states that remodel applications are reviewed to determine which city departments need to participate.
Before removing any kitchen wall:
- Confirm whether it supports roof, floor or lateral loads.
- Locate plumbing, electrical wiring, gas piping and ductwork inside it.
- Determine whether an engineer’s calculations and details are required.
- Include beam pockets, posts, footings and finish transitions in the cost.
- Obtain permit approval before demolition.
Open-concept work often adds more than a beam. Relocated systems, ceiling repair, flooring transitions and temporary support all affect the scope and schedule.
Which Plumbing, Electrical and Mechanical Permits May Be Required?
Moving kitchen utilities or adding new ones normally requires the corresponding trade permit. The permit must be obtained before the work is concealed behind cabinets, drywall, flooring or ceilings.
Plumbing permits
A plumbing permit may be required when the project:
- Moves a kitchen sink or dishwasher
- Adds a prep sink, pot filler or refrigerator water line
- Changes water-supply, drain or vent piping
- Replaces damaged piping beyond a simple fixture connection
- Adds or modifies a gas piping system where gas work is administered with plumbing
Moving a sink a short distance can still require changes to the drain slope and vent arrangement. An island sink is more involved because the drain and vent must be designed for an island configuration and routed through the floor.
Electrical permits
An electrical permit may be required when the project:
- Adds or relocates countertop receptacles
- Installs new lighting, switches or under-cabinet wiring
- Adds dedicated circuits for appliances
- Changes the electrical panel or service
- Hardwires a range hood, dishwasher, disposal or other equipment
- Replaces wiring uncovered during demolition
Modern appliance plans should be checked against the home’s available electrical capacity. An induction range, double oven or other high-load appliance can change circuit and service requirements. Final appliance specifications should be available before electrical rough-in.
Mechanical and gas permits
A mechanical or gas permit may be required when the project:
- Installs or relocates a gas range or cooktop
- Adds or modifies fuel-gas piping
- Changes a ducted range hood or exhaust route
- Installs equipment that changes the mechanical system
Bellevue’s mechanical permit guidance states that permits are required when installing or replacing fossil-fuel piping or appliances and when installing or replacing HVAC equipment. The final range-hood design may also need to address airflow, duct size and makeup air under the code that applies to the project.
The city issuing the building permit may also issue the trade permits. Do not assume Public Health handles plumbing throughout King County. Public Health’s current jurisdiction list covers Seattle, Clyde Hill and unincorporated King County. It directs properties in other King County cities to their city building department.
Who Issues Kitchen Remodel Permits in King County?
The property’s location determines the permit authority. Kirkland, Bellevue and Redmond issue permits for addresses inside their city limits. King County Permitting handles building permits in unincorporated King County.
| Property location | Primary building-permit authority | Main application system |
| Kirkland city limits | City of Kirkland | MyBuildingPermit.com |
| Bellevue city limits | City of Bellevue | MyBuildingPermit.com |
| Redmond city limits | City of Redmond | Redmond ePermitting Service, known as REPS |
| Unincorporated King County | King County for building and mechanical work, Public Health for plumbing and gas, and Washington L&I for electrical work | The required agency portal for each permit type |
A mailing address is not always proof that a property is inside a city. Some properties use a nearby city name while remaining unincorporated. Check the parcel and jurisdiction before choosing an application portal.
King County states that its Permitting Division issues building, mechanical and related permits for unincorporated areas. Permit authority is split for some trades in those areas. Public Health issues plumbing and gas permits, while the Washington Department of Labor and Industries handles electrical permits and inspections. L&I’s electrical jurisdiction guidance confirms that Kirkland, Bellevue and Redmond perform their own electrical permitting and inspections inside their city limits.
A project inside Kirkland, Bellevue or Redmond follows that city’s rules, fee schedule and inspection system instead. An unincorporated project may involve more than one agency, so its building, plumbing and electrical applications should be coordinated before work begins.
What Are Kirkland’s Kitchen Remodel Permit Requirements?
Kirkland generally requires permits for interior remodels, wall changes and alterations to electrical, plumbing, mechanical or gas systems. Finish work and true like-for-like replacement may be exempt when no regulated systems are modified.
Kirkland’s official list identifies these kitchen-related triggers:
- Interior remodels
- Addition, removal or relocation of any wall
- Electrical circuit and service extensions or alterations
- Gas piping installations or modifications
- New hose bibs or drinking fountains
- Drywall removal or installation
- New exterior openings and certain window work
The same guidance lists cabinets, countertops, tiling, carpeting and similar finish work as common exemptions. Like-for-like dishwashers, ovens, sinks and other fixtures can also be exempt when they remain in the same location and no gas line, plumbing line or electrical circuit is changed.
Kirkland applications, plan uploads, payments, status checks and inspections are handled through MyBuildingPermit.com. The city’s permit page advises applicants to contact Development Services when there is doubt rather than starting work based on an exemption assumption.
For a kitchen project in the city, Stonewell’s Kirkland kitchen remodeling page explains the construction scope that may accompany cabinets, utilities and layout changes.
What Are Bellevue’s Kitchen Remodel Permit Requirements?
Bellevue uses different paths for finish replacement, nonstructural remodeling and structural remodeling. Cabinet or countertop replacement alone does not need a building permit, while wall changes and regulated trade work can require permits and inspections.
Bellevue separates common kitchen projects as follows:
- Cabinets and countertops alone do not require a building permit.
- Plumbing and electrical permits may still be required when those systems change.
- A kitchen remodel or nonbearing wall change can use the single-family remodel permit without plan review when it stays within that permit’s limits.
- Load-bearing wall changes, new headers and enlarged openings require the structural remodel permit and plan review.
The structural remodel permit includes electrical, mechanical and plumbing work, with stated exceptions such as temporary power and fire protection. The project documents must still describe all included disciplines accurately.
Bellevue’s permit process is paperless through MyBuildingPermit. A permit that does not require plan review can generally be applied for, paid and issued the same day. Plans are required when the scope needs review. If a field inspector determines that a no-plan-review remodel exceeds that permit’s limits, plans and additional review fees can be required, and the city notes a possible three-week review turnaround.
Our Bellevue kitchen remodeling page covers the broader service scope for local renovation projects.
What Should Redmond Homeowners Know About Kitchen Permits?
Redmond exempts common finish work from a building permit, but residential remodels and separate electrical, mechanical or plumbing work follow the city’s application and review process.
Redmond’s residential work-exempt handout lists cabinets, countertops, painting, papering, tiling, carpeting and similar finishes. Its residential permit page provides separate applications for building, electrical, mechanical and plumbing permits.
Residential alteration and remodel applications are routed to the departments required by the scope. If the city requests additional information, it sends an issues matrix for correction and resubmittal. A project coordinator tracks the permit through the process.
Applications are submitted and managed through the Redmond ePermitting Service. Approved permits and plans must be available on site. Redmond requires inspections throughout the work and before regulated work is covered.
The city states that mechanical, electrical and plumbing applications requiring plan review typically have a two-week plan-review target. That figure should not be treated as the full time for a structural kitchen remodel. Building review, corrections and resubmittals can make the overall schedule longer.
See Stonewell’s Redmond kitchen remodeling page for the construction work that may be coordinated with local permits.
What Is the Kitchen Remodel Permit Application Process?
The process starts with a fixed scope, then moves through jurisdiction confirmation, application, plan review when required, permit issuance, construction inspections and final approval.
1. Confirm the permit jurisdiction
Verify that the address is inside Kirkland, Bellevue or Redmond, or determine that it is in unincorporated King County. The jurisdiction controls the application system, fees and inspections.
2. Define the complete scope
List every wall, cabinet, appliance, fixture, outlet, circuit, pipe, gas line and duct that will change. Vague descriptions can lead to the wrong permit type or later corrections.
3. Determine the permit set
Identify whether the project needs:
- A building or residential remodel permit
- Structural plan review
- Electrical approval
- Plumbing approval
- Mechanical or gas approval
- Additional review for an exterior opening, addition or other work
4. Prepare the documents
A simple trade permit may require an application and fixture or circuit information. A structural remodel can require existing and proposed floor plans, demolition plans, construction details, structural drawings and engineering calculations.
Plans should agree with the appliance schedule and cabinet layout. A range, sink or panel shown in different locations across documents can produce review comments and field conflicts.
5. Submit and pay intake fees
Kirkland and Bellevue use MyBuildingPermit. Redmond uses REPS. Upload legible files in the required format and pay the fees due at application.
6. Respond to review comments
Plan reviewers may request corrections or missing information. Answer every item and revise all affected sheets. Submitting only a written response while leaving conflicting drawings unchanged can cause another review cycle.
7. Receive the permit before starting regulated work
Approval is not the same as application acceptance. Do not remove walls or begin regulated trade work until the permit has been issued and the approved plans are available.
8. Schedule inspections at the required stages
Inspectors need to see framing, wiring, piping and other regulated work before it is concealed. Coordinate inspections with the cabinet and drywall schedule.
9. Obtain final approval
Complete the correction items and schedule final inspections. A project is not closed merely because the kitchen is usable or the contractor has left the site.
How Much Do Kitchen Remodel Permits Cost?
There is no single kitchen remodel permit price for Kirkland, Bellevue or Redmond. Fees depend on construction value, permit type, plan review, fixture or circuit counts, inspections and the number of disciplines involved.
A finish-only project may have no building-permit fee. A structural remodel with electrical, plumbing and mechanical work can generate several fee components. Revisions, reinspections or work outside normal hours can add charges.
Useful official fee tools include:
- Kirkland’s forms, publications and fee schedules
- Bellevue’s 2026 fee information and estimator
- Redmond’s Development Services fee page
- King County’s 2026 permit fee guides for unincorporated properties
For context, King County applies a $126 screening fee to most applications submitted to its Permitting Division in 2026. That county fee does not apply to a permit submitted to Kirkland, Bellevue or Redmond simply because the property is geographically within King County.
Ask the contractor’s estimate to separate permit fees from design, engineering and permit-management labor. An engineer’s fee is not a city permit fee. Neither is the time spent creating drawings or responding to corrections.
How Long Does Permit Review Take?
Review time depends more on complexity and application quality than on the label kitchen remodel. A no-plan-review permit may issue quickly, while structural review and correction cycles take longer.
Current official guidance provides a few useful reference points:
- Bellevue says a permit that does not require plan review can be applied for, paid and received the same day.
- Bellevue notes that a no-plan-review remodel moved into plan review after field inspection may involve a three-week turnaround.
- Redmond lists a typical two-week review time for mechanical, electrical or plumbing permits when plan review is required.
- Kirkland describes its posted processing dates as targets rather than guaranteed completion dates.
These figures are not interchangeable and should not be added together to predict a project start date. A structural remodel can involve intake screening, initial review, applicant corrections, resubmittal and permit issuance. Incomplete plans or changing the design during review commonly add more time than the first review itself.
Do not schedule demolition around an assumed approval date. Order long-lead cabinets with awareness that an approved layout or structural detail may still affect field dimensions.
Which Inspections Are Required During a Kitchen Remodel?
Inspections occur before regulated work is covered and again when the permitted work is complete. The exact sequence is listed on the permit and approved plans.
A permitted kitchen remodel may involve:
- A preconstruction meeting when required
- Framing or structural inspection after wall and beam work
- Rough plumbing inspection before pipes are concealed
- Rough electrical inspection before wiring is covered
- Mechanical or gas inspection before ducts or piping are concealed
- Insulation or drywall-related inspection when applicable
- Final inspections for each permit discipline
- Final building inspection to close the project
Do not install drywall or fixed cabinets over work that has not passed the required inspection. Kirkland’s inspection guidance states that building elements and each layer of construction must be inspected before cover. Redmond also requires inspections throughout the process and before work is covered. Bellevue instructs applicants to obtain all listed inspections and keep approved plans available on site.
Permit duration also varies. Redmond permits remain valid for 365 days without an inspection, and each passed inspection extends the expiration date by another 365 days. Bellevue instructs permit holders to start within one year and complete the work within three years. Always follow the dates and conditions printed on the actual permit.
The final inspection matters. It closes the record and confirms that required stages were approved. Bellevue cautions that most insurers will not cover damages involving work that was not inspected as required by the city.
Who Should Handle the Permits?
The homeowner can apply in many situations, but a full remodel is usually easier to coordinate when one responsible contractor manages the applications, corrections and inspection schedule. The contract should state exactly who performs each task and who pays each fee.
Permit handling includes more than submitting a form. The responsible party may need to:
- Confirm the jurisdiction and permit types
- Coordinate drawings with engineering and trade scopes
- Enter contractor and subcontractor license information
- Answer review comments
- Upload revised documents
- Keep the permit and plans on site
- Schedule inspections in the correct order
- Resolve inspection corrections
- Obtain final approval
Bellevue allows homeowners to identify themselves as performing the work, but anyone hired must hold the required Washington contractor license and a Bellevue business license. Other cities have their own contractor registration or business-license requirements.
If the homeowner applies while a contractor performs the work, responsibility can become unclear. The written agreement should identify the permit applicant, project contact, licensed trade contractors, inspection scheduler and person responsible for corrections.
Stonewell Remodel coordinates permitting and construction as part of qualifying kitchen remodeling projects in King County and the Eastside.
What Happens If Kitchen Work Is Done Without a Required Permit?
Unpermitted work can lead to stopped construction, correction notices, exposed finished work, added fees and an unresolved property record. The city may require concealed work to be opened so it can be inspected.
Possible consequences include:
- A stop-work order until permits are obtained
- Added investigation or reinspection fees
- Engineering or plans prepared after construction
- Removal of drywall, cabinets or finishes to expose the work
- Rebuilding work that does not meet code
- Delays during a sale, refinance or insurance claim
- An open permit record if final inspection is never completed
Obtaining a permit after the work is complete does not guarantee approval. The work still has to meet the applicable requirements and be available for inspection.
If prior unpermitted work is discovered during demolition, document it and contact the building official before covering or extending it. The correct response depends on the condition, age, scope and jurisdiction.
How Can Homeowners Avoid Permit Delays?
Permit delays are reduced by submitting a complete, coordinated scope and making decisions before review begins. Clear plans matter more than rushing an incomplete application.
Use this checklist:
- Verify the permit jurisdiction by parcel, not mailing address alone.
- Confirm which walls are structural before finalizing the layout.
- Select appliances before electrical and mechanical plans are completed.
- Show existing, demolished and proposed conditions clearly.
- Use the same dimensions and locations on every drawing.
- Include structural calculations and details when required.
- Identify all plumbing, electrical, gas and ventilation changes.
- Submit every document requested by the application portal.
- Respond to every correction item in one coordinated resubmittal.
- Keep approved plans available at the property.
- Schedule rough inspections before drywall and cabinets.
- Obtain all finals and confirm that the permit record is closed.
Changing the sink, range, island or wall location after permit approval can require revised plans. Resolve those decisions before review whenever possible.
Frequently Asked Questions About Kitchen Remodel Permits
Do I need a permit to replace kitchen cabinets?
A building permit is generally not required for cabinet replacement alone in Kirkland, Bellevue or Redmond. Electrical, plumbing, gas or wall changes performed with the cabinet work can still require separate permits. Keep the cabinet layout within the approved scope when other work is permitted.
Do I need a permit to replace kitchen countertops?
Countertop replacement alone is commonly exempt from a building permit. A plumbing permit may still apply if the sink, faucet, drain or supply piping is relocated or altered. Structural support changes for a heavy or cantilevered surface may also need review.
Does moving a kitchen sink require a permit?
Yes, relocating a sink normally requires plumbing approval because the water, drain and vent systems change. The new piping must remain visible for the required rough inspection before cabinets, flooring or drywall conceal it.
Can I replace a dishwasher without a permit?
A true like-for-like replacement may be exempt when it stays in the same location and no plumbing line or electrical circuit changes. Kirkland expressly lists this condition. Confirm the rule with Bellevue or Redmond for the project address before work begins.
Do I need a permit to add kitchen outlets or lighting?
Yes, adding or relocating outlets, switches, lighting or circuits normally requires an electrical permit. The larger remodel may also need a building permit. Electrical work must be inspected before wiring is covered.
Is a permit required to remove a non-load-bearing kitchen wall?
Often yes. Kirkland requires a permit to add, remove or relocate a wall whether it is load-bearing or not. Bellevue routes nonbearing wall changes through its no-plan-review remodel permit when the project stays within that permit’s limits. Redmond reviews the complete remodel scope.
Do I need an engineer to remove a load-bearing wall?
A structural design is normally required, and the jurisdiction may require engineering calculations and stamped details. The design must address the beam, posts, connections and support below. Confirm submittal requirements before hiring or ordering materials.
Does a new range hood require a permit?
A new or altered ducted range hood may require mechanical approval, especially when the duct route or airflow changes. Electrical work for a hardwired hood and gas work near a cooking appliance may require additional permits.
How long does a kitchen remodel permit take?
It can range from same-day issuance for qualifying no-plan-review work to several review cycles for a structural remodel. Bellevue lists same-day issuance for permits without plan review. Redmond lists a typical two-week review for trade permits that need plan review. Structural projects usually take longer.
Can a homeowner apply for the permit?
A homeowner can apply or act as the responsible party in many residential situations, but hired contractors must meet state and local licensing requirements. The contract should identify who submits plans, answers corrections, schedules inspections and closes the permits.
Are King County permit rules the same in every city?
No. Kirkland, Bellevue and Redmond administer permits under their own local processes. King County Permitting primarily serves unincorporated properties. The city or county with jurisdiction over the address determines the application, fees and inspections.
What should I do if old unpermitted work is found?
Stop before concealing or extending the work and contact the applicable building department. The city may require documentation, an after-the-fact permit, inspection openings, repairs or engineering. The correct path depends on what was built and whether it meets current requirements.
Plan the Permit Scope Before Construction
Permitting should be settled with the layout, utilities and structural design, not after demolition begins. A complete scope helps prevent redesigns, missed inspections and unfinished permit records.
Stonewell Remodel plans kitchen projects around the requirements of the jurisdiction where the home is located. If your remodel may involve wall removal, plumbing relocation, electrical upgrades or new ventilation, request a kitchen remodel consultation to review the scope and next steps.
Official Permit Sources
- City of Kirkland: Do you need a permit?
- City of Kirkland: Permit forms, publications and fees
- City of Bellevue: Work requiring permits
- City of Bellevue: Single-family remodel without plan review
- City of Bellevue: Structural single-family remodel permit
- City of Bellevue: Permit application process
- City of Redmond: Residential permits
- City of Redmond: Electrical, mechanical and plumbing permits
- City of Redmond: Work exempt from permit
- King County: Building permits in unincorporated areas
- Public Health Seattle and King County: Plumbing permit jurisdictions
- Washington L&I: City electrical permit and inspection jurisdictions